A new stacker crane, a plant that never stopped running, and 23 days to make it happen.

WEG's Metallurgical Department entrusted us with modernizing its automated storage system, taking advantage of the only available window: the year-end holiday shutdown. There was no room for error, and plant operations could not be interrupted.

WEG Brasil

WEG is a Brazilian multinational company and a world leader in the production of electric motors. The project was carried out in its Metallurgy Department, located at the Guaramirim plant (Santa Catarina, Brazil).

The Challenge

Upgrading a key facility without halting plant operations. WEG’s Metallurgical Department needed to replace an obsolete stacker crane and upgrade the conveyor systems and other critical components, all within a very limited timeframe: the year-end collective vacation shutdown. We took on this highly complex challenge and completed it in just 23 days.

Obsolete stacker crane

Very limited intervention windows

A plant that couldn't stop operating

High complexity of implementation

The solution
from ULMA

The project involved removing the existing equipment and installing a new, state-of-the-art stacker crane from Daifuku, our strategic partner for more than four decades and a global leader in the industry. In addition, we undertook a comprehensive upgrade of the conveyors and the replacement of various system components to optimize the facility’s overall performance.

New, State-of-the-Art Daifuku Stacker Crane

New, State-of-the-Art Daifuku Stacker Crane

Comprehensive Upgrade of the Conveyors

Comprehensive Upgrade of the Conveyors

Installation and commissioning in just 23 days

Installation and commissioning in just 23 days

The result

Thanks to this project, the Guaramirim plant (Santa Catarina, Brazil) now has a more efficient and reliable intralogistics system that is equipped to support WEG’s growth, improving productivity and ensuring operational continuity.

Projects like this reflect our commitment to each client: understanding their needs, adapting to their timelines, and executing with precision even in the most demanding scenarios.

Completed in record time

State-of-the-art technology

Greater efficiency and reliability

Guaranteed business continuity